Chinese translation for "cast concrete"
|
- 浇灌混凝土
浇注的混凝土 浇注混凝土 模铸混凝土, 混凝土铸件
Related Translations:
concrete: adj.1.具体的,有形的;实在的,实际的。2.固结成的,混凝土制的。3.图案诗歌的(参阅concrete poetry)。短语和例子a concrete fact 具体事实。 a concrete vessel 混凝土船。 in the concrete 具体地,实际上。n.具体物;凝结物;混凝土;【逻辑学】具体名词;【文学】具体诗歌。 a concrete-mixer casting: n.1.投,掷。2.【冶金】铸造;铸件。3.【动物;动物学】脱弃,脱落物〔如毛、皮等〕。4.计算。5.想法,手法。6.(木材等的)翘曲。7.【戏剧】配角。 cast: vt.(cast; cast)1.投,扔,掷,抛。 ★此义动词通常用 throw, cast 只用于若干特殊句子。2.丢弃,抛弃;脱掉(衣服);(蛇)脱(皮),(鸟)换(毛),(鹿)换(角);(树)落(叶);(马)脱落(掌铁)。3.(兽)早产,(果树)落(果)。4.【冶金】浇铸,铸造;【印刷】把(纸型)浇成铅版。5.计算;合计。6.【戏剧】分配(角色),选派(角色)。7.【
- Example Sentences:
| 1. | Specification for quality control of concrete and pre - cast concrete components 混凝土及预制混凝土构件质量控制规定 | | 2. | Post - tensioned pre - cast concrete simple - supported girder for railway bridge pro - stress 预应力混凝土铁路桥简支梁静载弯曲试验方法及评定标准 | | 3. | Basing on wenhui bridge ( the cable - stayed bridge ) , optimization of cable tension under dead loads , control of the course of cantilever casting concrete , and spatial analysis of the pylon and gird during construction were discussed in this paper 本文以文晖大桥为背景,就恒载索力优化、悬浇过程控制及索塔和主梁分段施工过程的空间分析等问题进行研究。 | | 4. | In a research of as - cast concrete applied in rail transit elevated station , this paper mainly discusses the design , construction and cost of as - cast concrete and expresses an optimistic view about its future application in urt elevated station 针对清水混凝土在高架车站应用的可能性进行了研究,提出了清水混凝土在高架车站的可应用范围、设计和施工的重点内容以及应用前景。 | | 5. | Especially , some new advanced techniques such as integral casting concrete , integral sliding formwork are firstly applied in this project in china . a new style bridge girder erection machine which can lift a piece of box girder weighting 300 tons once was designed and manufactured successfully 特别是本工程首次采用的一次性整体浇灌混凝土工艺、整体滑动模板设计、以及300吨拆装式架设机的研制成功,为今后同类产品的施工提供了一些新思路和宝贵的实践经验。 | | 6. | The works included 24 bored piles of 2 . 5 meters in diameter and 55 meters in depth , 500 meters long underground concrete diaphragm wall of 0 . 8 meters thick and 25 meters deep , 450 pre - cast concrete pile of 0 . 5 meters in diameter , 12 meters deep soil excavation with multi - layer post - tensioning shoring system , reinforced concrete pile caps and basement slabs 其工程内容包括了24支直径2 . 5米,深达55米直入岩层的钻孔桩,周长500米,深度25米,厚度0 . 8米的地下连续混凝土墙, 450支直径0 . 5米预制混凝土桩, 12米深开挖,多层水平钢支撑系统,混凝土桩承台及地库底板结构。 | | 7. | As soon as the tunnel boring machine advances 1m forward , 6 pieces of pre - cast concrete segment are fabricated and forming a ring with internal diameter of 5 . 6m to support soil outside , while simultaneous back - filling and 32 - hole chemical grouting injector equipment installed with tunnel boring machine consolidating soil instantaneously to enhance the soil strength . the tunnel boring machine is also equipped with guided top gyroscope and true circularity retaining device for construction accuracy 其中值得一提者,板桥土城线所采用之潜盾机系新型之土压平衡式机种,具同步背填灌浆之功能,对地表沉陷之控制成效优良,目前已贯通并通过民房及商业区下方之下行隧道其初期沉陷均控制在5mm之内,二次沉陷及最终沉陷平均总量最大亦仅18mm ,远优于初始设计的警戒值30mm 。 | | 8. | According as distortion harmonious condition of traction cable ' s anchorage on cable - suspended traveler , increasing amount of cable tension during casting concrete was computed , and under every key operating condition of casting concrete , traveler ' s frontend elevations were educed . we seriously controlled wenhui bridge ' s course of cantilever casting concrete by this method , which assured that the bridge ' s construction went on successfully . and then , it was discussed how to simulate the effect of prestressing force in spatial analysis 根据挂篮前端牵索锚固点处的变形协调条件建立了挂篮上混凝土浇筑过程中牵索索力的增加量,并推导了挂篮上混凝土浇筑过程中的各主要工况下挂篮前端标高的计算公式,对文晖大桥挂篮上混凝土浇筑过程中的牵索索力和挂篮前端标高进行了细致地控制,确保了混凝土浇筑的顺利进行,为整个主梁线形和索力的双控打下了良好的基础。 | | 9. | The paper expounds the constructing technology to assure the operating quality of the afterward casting zone from five aspects , namely the water reducing measure within afterward casting zone , shuttering construction , surface treatment at earlier casting concrete and reinforcing steel , selecting additives for afferward casting concrete , and the operating and curing technology used to afterward casting concrete 摘要从后浇带部位的降水措施、支模方法、先浇砼及钢筋的表面处理、后浇砼外加剂的选择、后浇砼的浇筑及养护等五个方面,论述了保证防水砼后浇带施工质量的施工技术措施。 |
- Similar Words:
- "cast coating" Chinese translation, "cast coating photo paper" Chinese translation, "cast cold" Chinese translation, "cast compatible types" Chinese translation, "cast composite" Chinese translation, "cast concrete product maker" Chinese translation, "cast concrete umbrella" Chinese translation, "cast copper" Chinese translation, "cast copper alloy" Chinese translation, "cast copper alloy for propeller" Chinese translation
|
|
|